Abstract

This paper addresses a multi-objective order scheduling problem in production planning under a complicated production environment with the consideration of multiple plants, multiple production departments and multiple production processes. A Pareto optimization model, combining a NSGA-II-based optimization process with an effective production process simulator, is developed to handle this problem. In the NSGA-II-based optimization process, a novel chromosome representation and modified genetic operators are presented while a heuristic pruning and final selection decision-making process is developed to select the final order scheduling solution from a set of Pareto optimal solutions. The production process simulator is developed to simulate the production process in the complicated production environment. Experiments based on industrial data are conducted to validate the proposed optimization model. Results show that the proposed model can effectively solve the order scheduling problem by generating Pareto optimal solutions which are superior to industrial solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.