Abstract

AbstractLot splitting is a new approach for improving productivity by dividing production lots into sublots. This approach enables accelerating production flow, reducing lead‐time and increasing the utilization of organization resources. Most of the lot splitting models in the literature have addressed a single objective problem, usually the makespan or flowtime objectives. Simultaneous minimization of these two objectives has rarely been addressed in the literature despite of its high relevancy to most industrial environments. This work aims at solving a multiobjective lot splitting problem for multiple products in a flowshop environment. Tight mixed‐integer linear programming (MILP) formulations for minimizing the makespan and flowtime are presented. Then, the MinMax solution, which takes both objectives into consideration, is defined and suggested as an alternative objective. By solving the MILP model, it was found that minimizing one objective results in an average loss of about 15% in the other objective. The MinMax solution, on the other hand, results in an average loss of 4.6% from the furthest objective and 2.5% from the closest objective. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.