Abstract

In this work, a kiln energy model was developed with the main objective of assessing energy consumption in industrial lumber kilns. The model simulates kiln energy consumption on the basis of a simplifi ed description of kiln technologies, energy systems and lumber characteristics, and it requires a minimum set of empirical parameters that are calibrated in practice. In this study, the model calibration was performed for a laboratory scale conventional kiln and three experimental drying runs of 50 mm thick spruce-pine lumber. The results of this study illustrate how the kiln energy model is calibrated, compares experimental and simulated MC, energy and water consumption, and describes how the model simulates different components of energy consumption that can be used to evaluate potential energy saving strategies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.