Abstract

Super-long pile bridges and high-rise buildings are commonly used in the form of pile foundation. In the flood area, due mainly silt stratum, as well as the decline in groundwater mound pile under the conditions set out in the consolidation, there will be a negative pile skin friction and negative friction obvious time effect, which bearing capacity of the pile has a great influence. Current research on negative friction for super-long pile considering time effect is relatively little. In the model box, on the base of the super-long pile silt model test, set out in a pile mound under consolidation, soil testing flour gradually over time preloading consolidation settlement, pile-soil relative displacement, so as to arrive negative friction pile variation with time, tip resistance variation with time from the pile-axial force curve deduce the location of the neutral point and changes in circumstances, the pile foundation engineering practice has a certain significance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call