Abstract

This paper discusses the development of simultaneous optimization model to determine component tolerance of assembly product and plant for manufacturing processes by considering quality tolerance limits, and delivery time constraint to minimize total cost in collaboration environment of make-to-order manufacturing systems. Total cost of the system consists of manufacturing costs and quality loss costs as the tolerance function, operational costs for multi-plant manufacturing collaboration which includes: setup costs, material handling costs, operating costs of assembly, manual operations costs, and transportation costs. Formulation of the model developed uses mixed integer non linear programming as a method of solution search. In the numerical examples presented, the optimization process results an optimal solution. Optimal solution is not sensitive if the changes in quality tolerance constraint and delivery time constraint is not large. While the addition of an alternative plant for producing a component can changes the alternative plant selected

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call