Abstract

DMI is a medium-sized company that produces electrical panel boxes. Make To Order (MTO) is a reference as the start of the production process. The production process includes plate cutting, bending, welding, grinding, powder coating and part-by-part assembly processes. Lean Manufacturing started in Japanese manufacturing, to eliminate all waste from the process while pursuing quality improvement in producing finished products. Value stream mapping is an important step in the lean transformation process before entering the waste elimination stage. which can lead to a decrease in the productivity of the company. One of the biggest problems was the lack of bending machines and not having our own powder coating machine.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call