Abstract
Abstract—Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement.Keywords—lead time, lean manufacturing, value stream mapping.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.