Abstract

Two-sided robotic assembly lines are employed to assemble large-sized high-volume products, where robots are allocated to the workstations to perform the tasks and human workers are replaced for achieving lower cost and greater flexibility in production. In the two-sided robotic assembly lines, setup times are unavoidable and it has been ignored in most of the reported works. There has been limited attention on this till date. This paper focusses on the robotic two-sided assembly line with consideration of sequence-dependent setup times and robot setup times. A new mixed integer linear programming model is developed with the objective of optimizing the cycle time. Due to the NP-hard nature of the considered problem, this paper proposes a set of metaheuristics to solve this considered problem, where two main scenarios with low and high setup time’s variability are considered. Computational results verify that this new model is capable to achieve the optimal solutions for small-size instances whereas the simple adoption of the published mathematical model might produce wrong solutions for the considered problem. A comprehensive study with 13 algorithms demonstrates that the two variants of artificial bee colony algorithm and migrating bird optimization algorithm are capable to achieve the optimality for small-size instances and to obtain promising results for large-size instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.