Abstract

We present a mixed integer linear programming (MILP) approach for an aggregate production planning (APP) problem of an electronics manufacturer. A multi-item, multi-facility, multi-stage capacity planning problem over a finite planning horizon with deterministic demand is considered. We include the flexibility instruments shift planning, overtime account, and flexible maintenance. We present an extensive computational study where the proposed model is applied in a real-world case study and for randomly generated instances. Using a full factorial experimental design we evaluate the cost saving potentials of the flexibility instruments and their combinations. The computational efficiency of the proposed model formulation is investigated by different MILP solvers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.