Abstract

In 2016, a Mathematics-in-Industry Study Group (MISG) project considered the construction of mining sequences, that is, the process connecting ore extraction with specific orders. In particular, the meeting considered the potential for using knowledge about geological variability within the ore. This article revisits this MISG project and the approach developed for thinking about the problem as the build for an order progresses. We provide new perspectives on this approach and outline possible ways for further development.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call