Abstract

We consider the total weighted completion time minimization in the following scheduling problem. There are m identical resources available at each time unit, and n jobs. Each job requires a number si of resources and one resource can only be assigned to one job at each time unit. Each job is also called fully parallel such that the job is satisfied once it receives enough resources no matter how the resources distribute. The objective is to find a schedule that minimizes ∑wiCi, where wi is the weight of job Ji and Ci is the time when job Ji receives si resources. We show that the total weighted completion time minimization is NP-hard when m is an input of the problem. We then give a simple greedy algorithm with an approximation ratio 2. Finally, we present a polynomial time algorithm with complexity O(nd+1) to solve this problem when the number of different resource requirements that are not multiples of m is at most d.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call