Abstract

This paper considers a scheduling problem for a single burn-in oven in semiconductor manufacturing industry where the oven is a batch processing machine and each batch processing time is represented by the largest processing time among those of all the jobs contained in the batch. The objective measure of the problem is the maximum completion time (makespan) of all jobs. This paper investigates a static case in which all jobs are available to process at time zero, and also analyzes a dynamic case with different job-release times, for which a branch-and-bound algorithm and several heuristics are exploited. The worst case error performance ratios of the heuristics are also derived.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.