Abstract

This paper aims at minimizing the makespan for a single batch processing machine with non-identical job sizes (NSBM) using neural nets (NN) approach. NN approach was proved effective to solve combinatorial optimization problems but no application to NSBM problems hitherto. This research provides new methods to code the NN with the introduction of Master Weight Matrix (MWM). Computational experiments show that the NN approach outperforms other algorithms in various circumstances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.