Abstract

This paper is focused on the methods, which are used for planning, running and optimization of material flow. These methods are very important element of each production and company. There are several methods which are used, for example JIT (Just in Time), Kanban, TOC (Theorie of Constraints), etc. A selection of appropriate method affects largely production costs, efficiency and produced quantity. For the laboratory of flexible manufacturing systems with robotized manipulation supported by no drawing production were compared several methods and on the based their advantages, disadvantages and suitability of use was selected the most appropriate method of planning, running and optimization of material flow.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call