Abstract

In this paper the combined fleet-design, ship-scheduling and cargo-routing problem with limited availability of ships in liner shipping is considered. A composite solution approach is proposed in which the ports are first aggregated into port clusters to reduce the problem size. When the cargo flows are disaggregated, a feeder service network is introduced to ship the cargo within a port cluster. The solution method is tested on a problem instance containing 58 ports on the Asia–Europe trade lane of Maersk. The best obtained profit gives an improvement of more than 10% compared to the reference network based on the Maersk network.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call