Abstract

In the article reflections on graphical methods and techniques used in improving project management are presented. Based on the conducted research, was noted that in the majority of informatics tools, the creation methods of Gantt’s Chart and network techniques are being used, that allow graphs’ presentation showing project’s schedule task, where the time is a primary variable. It is not possible, by the model of graphics technology used in other areas, such as in medicine, cartography and architecture, browse simultaneously on several project’s levels a number of parameters, which are together in specific relationships and dependencies, that have an impact on decision-making by the project manager and appropriate course of the subsequent stages, which in turn will ensure the achievement of adopted objective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.