Abstract

The scheduling problem for the synchronous dataflow graph (SDF) is considered. A method of the SDF scheduling is proposed which is based on transforming SDF into spatial SDF. The circular schedule has the period of L cycles. Each spatial SDF node has the coordinates of space and time of an event, where and when the respective algorithm steps were performed. A set of restrictions, which the SDF nodes have, helps to derive the circular schedule with the optimum load balancing. So, the nodes, which are mapped into a single resource, must not have the same clock cycles modulo L , and the number of such nodes has to approach L . The resulting schedule is implemented in the pipelined datapath. The algorithm for computing the suboptimal schedule is proposed based on the spatial SDF.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.