Abstract

The article presents a mathematical model of the process of diagnosing and repairing preventive public transport buses. The mathematical model was developed using the theory of semi-Markov processes. The presented model considers two types of corrective repairs - carried out by the Technical Emergency Service and at Service Stations, and preventive repair. The presented model of the exploitation process system has been described to a small extent in the literature so far. The considered system is analyzed on the basis of two criteria: the availability of public transport buses and the profit per unit time. For the adopted assumptions, the conditions for the existence of an extremum of the criterion function were formulated. In the article, the presented model is illustrated based on sample results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.