Abstract

This research was conducted at a fertilizer company in Sumatra, where companies that produce fertilizers in large quantities to meet the needs of consumers. This company cannot be separated from issues related to the performance/effectiveness of the machinery and equipment. It can be seen from the engine that runs every day without a break resulted in not all of the quality of products in accordance with the quality standards set by the company. Therefore, to measure and improve the performance of the machine in the unit Plant Urea-1 as a whole then used method of Overall Equipment Effectiveness (OEE), which is one important element in the Total Productive Maintenance (TPM) to measure the effectiveness of the machine so that it can take measures to maintain that level. In July, August and September OEE values above the standard set at 85%. Meanwhile, in October, November and December have not reached the standard OEE values. The low value of OEE due to lack of time availability of machines for the production shut down due to the occurrence of the engine long enough so that the availability of reduced production time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.