Abstract

At the Barnaul Apparatus and Machine Plant a mechanized line for washing parts before tinting and electroplating has been designed and built. The line is a drum-type mechanized production line consisting of an electric hoist, 5 baths, a loader and an unloader, a drive station, drums, and a ventilation system. The introduction of the mechanized line into the plating area has made it possible to free 3 people for other work, to improve sanitary and hygienic working conditions, and to increase production culture.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call