Abstract

The development of industrial areas with difficult climatic conditions and high environmental burden on the population requires innovative management approaches from the construction industry, including energy construction as a factor of safety and reliability, as a basis for the development of enterprises in the region and urban development. The purpose of this study is to determine the place and role of complex construction contracts (CСC) in the life cycle (LC) of an industrial capital construction facility and to form mechanisms for improving the implementation of CСC to ensure the innovative nature of such an object at all stages of its LC within the framework of the relationship with the development of the economy of the studied region as a whole. The LC model proposed in the study allows us to determine the place and role of innovation engineering assessment at each stage of the implementation of large engineering projects during the construction of capital construction facilities within the framework of territorial development management. The combination of methods for assessing innovativeness will reveal the necessary reserves for accelerated development of territories with maximizing environmental and economic effects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call