Abstract

Urban underground rail transit in China serves people, but at the same time, there is a problem of insufficient utilization of resources. To make more effective use of subway resources and alleviate traffic pressure, aiming at the problem of insufficient use of time and space resources in the process of Metro operation, this paper proposes a logistics system of underground railway based on the underground logistics system of passenger and freight co-transported. On this basis, the mechanical structure design of the system is carried out in the aspects of metro transportation and transformation of the Metro station. Firstly, the paper analyses the shortcomings in the current situation of Metro operation, discusses the underground logistics system of passenger and freight co-transportation, then focuses on the mechanical structure design of the system, and uses SolidWorks to simulate and analyze the mechanical structure to ensure the feasibility of the system and improve the utilization rate of Metro resources.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.