Abstract

The purpose of this research is to calculate the value of productivity carried out in the production of Bolt Hexagon Nut M10X 60MM that have applied the Just in Time method. Machine productivity calculations are carried out using Manufacturing Cycle Effectiveness (MCE) to reduce non-value-added processes. The results of research conducted from January to December 2017 showed an increase in the MCE value of 35%, and productivity increased by 139.75 kg / hour for one year. The calculation shows that MCE is very effective for use in planning and improving value-added activities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.