Abstract
A bridge is a civil engineering construction that has been used for generations to cross any obstacle below it. There are many conflicts in bridge construction, and they are getting worse every day. A flyover bridge has been constructed to reduce traffic congestion. Project costs may directly rise if there is a delay in completing the work. The act of analyzing a project's delay and determining its underlying causes is known as delay analysis. A contractual issue at the Zone 3 junction has caused project delays, which have impacted on the project time limit. Delays caused by factors beyond the parties’ control (Force Majeure) and Delays caused by an unbalanced contract. The EVM technique is used for evaluating Bridge Construction,which allows for project tracking. Construction project performance is investigated to determine the possibility of cost and time overruns, as well as the Estimation at Completion (EAC) and To-Complete Performance Index (TCPI) to evaluate how efficiently the remaining financial resources are used. To conduct analysis on the construction project's performance and identify critical issues regarding schedule andcost, a delayed construction project was chosen as a case study for this project. Delay Analysis was also conducted to determine the causes behind the project's variance in duration. KEYWORDS- Stake holder involvement, Contingency plan, Procurement scheduling, Resource management, Contractual consideration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.