Abstract
Shop floor control (SFC) is one of the main concepts in manufacturing resource planning (MRPII) and production scheduling is a key element in SFC. This paper studies the hybrid flow shop scheduling problem where jobs are multiprocessor. The objective is to minimize total completion time. Although there are several papers considering hybrid flow-shop scheduling problem with multiprocessor tasks, but none propose a mathematical model for this problem. At first, the two problems (fixed and selective cases) are mathematically formulated by mixed integer linear programming models. Using commercial software, the model is used to solve the small instances of the problems. Moreover, an elephant herding optimization is developed to solve large instances of the problems. To numerically evaluate the proposed algorithm, it is compared with two available algorithms in the literature, simulated annealing and shuffled frog-leaping algorithm in the literature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.