Abstract

The orthodox way of tile printing results in mulish production. To tame this, digital inkjet printing technology was imposed. In this article, a mathematical prototype is designed exclusively for the tile printing wing. The various plants coming under printing are correlated to the proposed prototype. The article throws light on the functioning of the prototype. The prototype turns up subservient to bulk service queue models with two types of vacations. The prototype is resolved under the supplementary variable technique. The prototype with peculiar conditions is proved to be the existing model. Anticipated line distance, awaited active duration, awaited standby time, and expected idle period were computed. Thus, the total average cost is acquired for diverse vacation values. The main intention of the pattern is to downside the total average cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.