Abstract

Abstract In this paper the author tells how the particular problem of delivering parts to the car-assembly line, that can not be handled efficiently by conveyors, is taken care of in the Chrysler plant. The quantities of materials to be handled are obtained from the daily-production schedule. Loads were standardized, and moved at regular intervals by jitneys. Requisition sheets for material are made up according to specified loads to meet transportation requirements, and are issued to the stock man at pick-up points. A copy of the requisition serves as a transportation order for the jitney operators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.