Abstract

In this paper, the problem of ordering a series of production runs to meet a single make-to-order demand, where the various stages in the production process have binomial yields, is addressed. The use of additional procurement of part-finished material or reworking defective material previously made to supplement yield at any stage is considered. The costs of this and manufacture, disposal of surplus or shortage are assumed to be proportional to the numbers involved. Set-up costs may or may not be incurred. The treatment follows from, and builds on, a previous single-run analytical result by developing an approximation in which the problem is decomposed into a series of single runs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.