Abstract

The problem of ordering a single or a series of production runs to meet a single make-to-order demand, where the various stages in the production process have binomial yields, is addressed. Use of additional procurement of part-finished products or reworking defective material previously made to supplement yields at any stage is considered. The costs of this and manufacture, disposal of surplus or shortages are assumed to be proportional to the numbers involved. It is shown that when a single production run is considered, the optimal policy is defined by two critical numbers (control limits) at each stage. The treatment of ordering a series of production runs follows from and builds on the single run analytical result by developing an approximation in which the problem is decomposed into a series of single runs. Set-up costs may or may not be incurred.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.