Abstract

Management system and its components, the management system of quality inspection, management system of safety and health protection at work and management system of environmental protection are widely used within the building industry. Hence, processes like preparation, compliance and evaluation of the management system are clearly definable and they guarantee that the construction was built not only within the boundaries of the latest acts, decrees, and other important regulations, but also that the construction was constructed inside the framework of pre-defined elements of the management system. In terms of the actual building production process it is possible to define the parts of the management system with regards to its individual phases. These phases include the management system of investment preparation as part of the investment decision-making process, the management system of the preand in-design phase, management system of contractor selection, management system of building production process, management system for commissioning of the construction and the management system of utilization (including inand postterm warranties and customer care). In engineering practice, first of all a great emphasis is put onto the management systems of building production, which is often prepared improperly and insufficiently or is just partially neglected by the contractor. Basically, failures within the implementation of the elements of the management system do often lead to a breach of contracted terms, degradation of quality of building realisation and may ultimately lead to the rescission of contract between the client and the contractor.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call