Abstract

OverBased on RCM analysis for each critical subsystem obtained interval preventive maintenance for transfer roller 127.60 hours, Ink fountain roller 24.45 hours, ink form roller 29.23 hours respectively, and the wash-up device is no scheduled maintenance. For spare parts inventory strategies the result using RCS method are: transfer roller104 units, ink fountain roller requires 32 units, ink form roller 36 units and are holding spare policy required, and a wash-up device no holding spare parts.
 
 Inserted: r
 
 Inserted: u
 
 Inserted: ng
 
 Inserted: foll
 
 Inserted: polic
 
 Inserted: d
 
 Inserted: the
 
 Deleted:in acc
 
 Deleted:rdance
 
 Deleted:th
 
 Deleted:i
 
 Deleted: accor
 
 Deleted:anc
 
 Deleted: with
 
 Deleted:strateg

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call