Abstract
Since the DELTA accelerator facility does not use a White circuit-driven fast topping-up mode, each software-driven injection ramp cycle takes about 7 seconds. Depending on the injection efficiency, 150 to 200 ramp cycles are required to reach the maximum beam current of 130 mA in the storage ring. Thus, for fast post-injection, a high electron transfer rate is crucial. During the injection process, a large number of parameters (e. g., magnet settings, timings of pulsed elements) have to be adjusted manually. The injection efficiency depends mainly on the settings of the booster extraction elements, the T2 transfer line magnets, and the storage ring injection components. In order to automate the injection procedure and to improve the electron transfer efficiency, the application of innovative machine learning concepts was studied.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have