Abstract
<p>The Angus L. Macdonald Bridge, a major suspension bridge that crosses Halifax Harbour in Halifax, Nova Scotia, opened to traffic in 1955. The bridge deck has reached the end of its service life, and the design of the new bridge superstructure and its replacement sequence were completed in 2014. The entire suspended structure and hangers are now being replaced sequentially during night and weekend closures while the bridge is opened for traffic during the daytime. The erection sequence is supported by sophisticated automated erection analysis models which take into account the geometry of the existing bridge, positioning of the erection equipment on the deck, and hanger and strand jack adjustments that are required during construction. Significant wind tunnel testing and analysis have been performed to ensure aerodynamic stability of the bridge during erection and in its final condition.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.