Abstract
This article, written by Special Publications Editor Adam Wilson, contains highlights of paper IPTC 18215, “LULA Exercise: Testing the Oil-Spill Response to a Deep-Sea Blowout, With a Unique Combination of Surface and Subsea Response Techniques,” by C. Michel, L. Cazes, and C. Eygun, Total E&P Angola, and L. Page-Jones and J.-Y. Huet, OTRA, prepared for the 2014 International Petroleum Technology Conference, Kuala Lumpur, 10–12 December. The paper has not been peer reviewed. To test the improved blowout-response capabilities implemented following the Deepwater Horizon accident, Total organized and ran a large exercise to check the ability to efficiently define, implement, and manage the response to a major oil spill resulting from a subsea blowout, including the mobilization of a new subsea-dispersant-injection (SSDI) device. After a year and a half of preparation, the exercise took place 13–15 November 2013. Introduction The oil-spill-response exercise, codenamed LULA, considered a scenario in which a blowout at a water depth of 1,000 ft resulted in an uncontrolled release at 50,000 BOPD. The main objectives of the LULA exercise were To mobilize all the emergency and crisis units in Luanda, Angola; offshore; and in Paris To use all the techniques and technologies available to track an oil slick To mobilize the SSDI kit from Norway to Angola and to deploy it close to the well To deploy all the available oilspill-response equipment of Total E&P Angola To test the procurement of dispersant and the associated logistics To test the onshore response, including coastal protection, onshore cleanup, oiled-wildlife management, and waste management Subsea Response During the Deepwater Horizon disaster, the injection of dispersant directly at the source of the oil leakage at seafloor level proved to be an effective technique. The technique required the deployment of an SSDI system. After the Deepwater Horizon accident, Total was involved with a group of nine major oil and gas companies in the Subsea Well Response Project. As a result of the work of this group, two SSDI kits were manufactured and positioned in Stavanger. Total wanted to test the ability to mobilize and deploy in a timely manner the newly developed equipment, and Total E&P Angola was designated as responsible for the organization of the LULA exercise in collaboration with the Ministry of Petroleum of Angola. The SSDI kit, positioned in Norway, would be transported by air to Angola, sent offshore, and deployed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.