Abstract

The Large Synoptic Survey Telescope (LSST) Telescope integration and test plan is phased to ensure that subsystems and services are available to support the integration flow. It begins with the summit facility construction and shows how the major subsystems feed into the activities through final testing. In order to minimize the amount of hardware mated for the first time during that period, the approach is to favor all hardware mated and pre-tested at vendors’ facilities with associated hardware and software prior to delivery onsite. The integration and test plan exploits the diffraction limited on-axis image quality of the three-mirror design. In addition, fiducials will be used during optical acceptance testing at vendors’ facilities to capture the optical axis geometry of each optical element. These fiducials will be used during the integration and tests sequence to facilitate the telescope optical alignment. In this paper, we describe the major steps of the LSST telescope integration and test sequence prior to the start of commissioning with the science camera.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.