Abstract
The planned construction and completion of the Large Synoptic Survey Telescope (LSST) Project consists of phased activities. The initial telescope construction period will transition to a multi-year commissioning phase, which will conclude with final hand off to science operations. The initial telescope alignment will utilize laser tracker fiducials and nodal aberration theory (NAT) to demonstrate Engineering First Light with a three-mirror optical system and test camera, prior to the integration of the science camera. This plan exploits the diffraction limited on-axis image quality of the three-mirror design. Commissioning consists of final integration of the three LSST subsystems (Telescope, Camera, and Data Management), followed by on-sky science verification to show compliance with the survey performance specifications.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.