Abstract

To mitigate carbon emissions during the construction of deep foundation pit support in undulating strata, a theoretical calculation approach was utilized to design and compute the foundation pit support for Qingdao’s Metro Line 4. On this basis, the numerical simulation method is used to optimize the design scheme of foundation pit support with the surface deformation and the stress of the support structure. The results of numerical simulation show that the final ground settlement is 5.26 mm, the maximum horizontal displacement is 0.2836 mm, and the corresponding maximum shear force of the retaining pile is 250 kN, which is obviously superior to the ground settlement of 55 mm, 33 mm, and 1341.03 kN in the theoretical design. The use of simulation software before the construction and support of deep foundation pit excavation can reduce resource waste and achieve low-carbon design while ensuring construction safety.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.