Abstract

The safety of deep foundation pit excavation has always been an important topic of urban construction safety. The traditional method is to control the construction safety by monitoring and adjusting the construction process, but the timeliness of monitoring makes it limited in the control of construction safety. In this paper, MIDAS / GTS software is used to simulate the excavation process of a hospital foundation pit in Guiyang. The maximum horizontal displacement in X direction is 4.03mm, and the minimum is -4.78mm. The maximum horizontal displacement in Y direction is 4.41mm, and the minimum horizontal displacement is - 4.9mm. Through the study of the common horizontal X and Y displacement nephogram of crown beam, waist beam and anchor, the synergistic effect can be well expressed. The maximum horizontal displacement in X direction is 5.56mm. The minimum horizontal displacement is - 3.54mm. The maximum horizontal displacement in Y direction is 6.56mm. The minimum horizontal displacement is - 4.45mm. By comparing the numerical simulation results with the field measurement results, the reliability of the numerical simulation in the evaluation of the foundation pit is fully proved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call