Abstract

In this paper, a single-item capacitated lot-sizing problem in a flow-shop system with energy consideration is studied. The planning horizon is defined by a set of periods where each one is characterised by a length, an allowed maximal power, an electricity price, a power price and a demand. The objective is to determine the quantities to be produced by each machine at each period while minimising the production cost in terms of electrical, inventory, set-up and power required costs. For medium- and large-scale problems, lot-sizing problems are hard to solve. Therefore, in this study, two heuristics are developed to solve this problem in a reasonable time. To evaluate the performances of these heuristics, computational experiments are presented and numerical results are discussed and analysed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call