Abstract

This paper discusses a multi-item capacitated lot-sizing and scheduling problem in a flow-shop system with energy consideration. A mixed integer linear programming is formulated. The planning horizon is defined by a set of periods where each one is characterized by a length, an electricity price, a maximal allowed power and an external demand. Since the capacitated lot-sizing problems are NP-hard, a fix-and-relax heuristic is developed. To evaluate the effectiveness of the proposed heuristic, computational experiments are presented and numerical results are discussed and analyzed. The obtained results are promising.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.