Abstract

Bottom sounding and sediment sampling were carried out before and after 1975 and 2001 floods. Discharged sediment was estimated by riverbed change calculation. The grain distribution except the fine grain components equal to or less than 80μm almost coincided with the grain distribution of river terrace. Total deposition volumes calculated from the change topography of river-mouth were estimated by the coarse components more than 80μm of discharged sediment. The mean volume for 30 years of the coarse discharged sediment are 6.8*105 m3/year. The volume of river terrace increases rapidly for big flood and decreases slowly for several years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.