Abstract
Pacific and Atlantic Ocean sea surface temperatures (SSTs) were used as predictors in a long lead-time streamflow forecast model in which the partial least squares regression (PLSR) technique was used with over 600 unimpaired streamflow stations in the continental United States. Initially, PLSR calibration (or test) models were developed for each station, using the previous spring-summer Pacific (or Atlantic) Ocean SSTs as predictors. Regions were identified in the Pacific Northwest, Upper Colorado River Basin, Midwest, and Atlantic states in which Pacific Ocean SSTs resulted in skillful forecasts. Atlantic Ocean SSTs resulted in significant regions being identified in the Pacific Northwest, Midwest, and Atlantic states. Next, streamflow stations were selected in the Columbia River Basin, Upper Colorado River Basin, and Mississippi River Basin and a PLSR cross-validation model (i.e., forecast) was developed. The results of the PLSR cross-validation model for each station varied with linear error in probab...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.