Abstract

The paper is a powerpoint presentation on the safety assurance system of London Underground Ltd. An overview of the private public partnership (PPP) is given and the role of the Engineering Directorate is presented. Safety assurance of London Underground Ltd and compliant assets are discussed supported by assurance maturity models. (12 pages)

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call