Abstract

In recent years, the prefabricated house industry has rapid development,.Because of fewer suppliers, higher demand transport scheme and complex quality test, the risks of construction engineering logistics links are relatively high. Studying how to effectively evaluate the risks of construction engineering logistics links is significant. According to the characteristics of the prefabricated house construction engineering, we analyse the construction engineering logistics risks and use the combined weights method to determine the weight of indexes which contains both subjective and objective factors, to improve the scientific value and the validity of the assessment. Based on credibility measure method, a new logistics risk evaluation model in prefabricated housing is established to estimate the risk during making prefabricated house construction engineering. The presented model can avoid the subjectivity of selecting the membership function and solve the problem of how to comprehensively assess the construction engineering logistics risk in a certain extent.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.