Abstract

The analysis of the conditions and risks of the supply of structures and materials for the construction of the Nizhneboguchansk hydroelectric power station in the Boguchansk industrial region has been carried out. The article considers the production of structures and materials for the construction of hydroelectric power plants on the territory of the Krasnoyarsk Territory. It is proposed to organize industrial sites according to the principle of an industrial technopark to reduce the costs of ancillary enterprises for the construction of the Nizhneboguchansk hydroelectric complex, which will create an additional socio-economic effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.