Abstract

With the phenomenon of loess tunnel lining cracking, tunnel lining crack was analyzed by the engineering background of Qiaoyuan tunnel. Researching tunnel crack number, width and length, tunnel stress field was established by numerical simulation. In order to maintain the long-term stability of the tunnel, establishing monitoring system with BOTDR sensing technology, positioning tunnel diseases place accurately, measures would be taken timely before arising large lining crack.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.