Abstract

The process of locomotive bogie wheelset assembly was investigated in-depth. And the Jidoka process of wheelset assembly based on automatic storage and retrieval system was researched. The wheelset assembly Jidoka system structure and function were discussed. The wheelset fitted optimization mathematical model was set up.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call