Abstract

This paper covers load rejection tests performed upon subcritical units of the American Electric Power System. These tests were performed in order to gain insight into the response of units to full load rejection, and to see if a unit could successfully carry its electrically driven auxiliaries for several hours, otherwise disconnected from the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.