Abstract

This paper describes a linear programming (LP) problem formulation applicable to the static-timing analysis of large scale synchronous circuits with level-sensitive latches. Specifically, an LP formulation for the clock period minimization problem is developed. In order to minimize the clock period of level-sensitive circuits, the simultaneous effects of time borrowing and nonzero clock skew scheduling are considered. The clock period minimization problem is formulated for both single-phase and multi-phase clocking schemes. The ISCAS'89 benchmark circuits are used to derive experimental results. LP minimization problems for these benchmark circuits are generated using the modified big M (MBM) method and the generated problems are solved using the industrial LP solver CPLEX . The experimental results demonstrate up to 63% improvements in minimum clock period compared to flip-flop based circuits with zero clock skew.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.