Abstract

With the growth of wind energy for power generation, several transmission system operators (TSOs) have increasing difficulties to forecast congestions due to the unpredictable nature of the energy source. This paper proposes to enhance congestion management using a real time supervisor. This supervisor performs automatic and dynamic re-dispatchings using both variable speed wind generators and conventional generators. In order to minimize production constraints, the real time congestion management system is based on an indicator of the efficiency of a re-dispatching on the power flowing in an overloaded line. This approach leads to reduced re-dispatching costs and increased network reliability. The simulation of the IEEE 14-bus test power system enhanced by the supervision system is done using the software “EUROSTAG”. Grid integration of renewable generation is therefore increased through renewable production maximization while ensuring network security.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.